Good evening, Avery
Here’s the plan in your original sample workspace.LOCAL DESIGN STUDY
Effort overview
Sample window ends 22 Nov 2026. Bars group due dates by weekday.
Recent activity
Original sample notes and changes in this tab
Projects
Arrange the tasks in this local design workspace.
Inbox
You have 3 unread sample notes.
Analytics
Explore the same task records behind the board and dashboard.
Status distribution
Counts in the current analytics filter
Effort by category
Authored estimated hours, summed from matching tasks
Task records
| ID | TASK | OWNER | CATEGORY | DUE DATE | HOURS | STATUS |
|---|
Settings
Manage the display profile and local workspace preferences.
Display preferences
Choose which local indicators appear
Inbox indicators
Show unread badges beside navigation
Activity highlights
Show the dashboard’s sample activity list
Project updates
Add task edits to the local activity feed
Draft reminders
Show a local status after saving a draft
Weekly summary
Include a calculated summary in the feed
Theme is remembered in this browser under a study-specific key. All other edits last in this tab only. No email or push notifications are configured.